The NeutralsORG

World Neutrals Summit 2026 — Barcelona · August 2026 · 58 spots remaining → Participate at Barcelona
TheNeutrals.ORG™
$200Clarity Snapshot™ from
11sections in every NER report
3–5days delivery
INDS™every evaluation governed
Submit NE-01 Intake →
System 02 · DRS
Dispute Resolution Systems

Seven instruments. One methodology. Arbitration is always the last resort — every instrument before it is designed to prevent it.

Explore DRS →
$800
Mediation from
56+
Convention countries
48h
Appointment
$800Mediation from
56+Singapore Convention countries
164NY Convention countries
48happointment confirmation
Appoint a Neutral →
The Neutral Profession
Get Certified. Join the Bench.

1,329+ certified neutrals. 80+ countries. 12 sector benches. Exclusive by design — maximum 10 per sector per country.

The Profession →
1,329+
Certified
80+
Countries
12
Benches
1,329+certified neutrals
80+countries represented
12sector benches
10max per sector per country
Apply — Free →
Octavian Brasai
FICM COI Checked CPD Current Construction, Infrastructure & Real Estate Projects Bench

Octavian Brasai

Arbitrator & Mediator

Bistrita, Romania · Europe
Bench: Construction, Infrastructure & Real Estate Projects Bench Practice: mediation arbitration Sectors: Construction Engineering and Infrastructure Disputes
Professional Biography
Member of professional societies:
  • APDP (Professional Association of Roads and Bridges in Romania)
  • ARIC member (Romanian Association of Consultants Engineers)
  • DRBF (International Commission on Dispute Resolution)
  • FIDIC (International Federation of Consulting Engineers)
  • CAD member (Adjudication of disputes) - Adjudicator
  • Member of the Court of Arbitration Cluj – Arbitrator
Experience gained in other countries:
  • 1980 - 1990 - Romania
  • 1991 -1992 - France
  • 1993 - present - Romania
Occupied positions
Period: 2018 – june 2019 Location: Romania Employer: Ministry of Transport - CNADNR (CNAIR) Function: FIDIC expert Description: Disputes and Arbitration Motorway A1, A3, A10 Value in Dispute: 134 millionEURO Period: 2016-2017 Location: Romania Employer: Ministry of Transport - CNADNR Function: Senior Resident Engineer Description: Orastie - Sibiu Motorway Value: 271 million EURO Period: 2012 - 2015 Location: Romania Employer: Egis International France S.A. Function: Resident Project Manager Description: Arad - Timisoara - Lugoj Motorway Total value: 332 million EURO Period: 2010 - 2011 Location: Romania Employer: Egis International France S.A. Function: Resident Engineer Description: Motorway Arad - Timisoara Value: 142 million EURO
Overview
Constructor Engineer and Economist with more than 39 years experience, of whom over 20 years have been in senior position, covering the following areas:civil, industrial, agrozootechnical, urban, hydrotechnical, motorways, uneven passages, bridge and road supervision; construction of roads - bridges, tunnels, airports and aviation runways, rehabilitation and maintenance of national roads. Since 1996, I have worked on the supervision of
Qualifications & Education
  • Polytechnic Institute Cluj - Napoca, - Faculty of Civil Engineering, 1975 - 1980, Diplomat Engineer
  • Polytechnic Institute \"Traian Vuia\" Timisoara, 1984 - 1985, Postgraduate Courses - Specialist Contractor Engineer
  • \"Babes Bolyai\" University of Cluj-Napoca, Faculty of Economic Sciences, 1985 - 1990, Economist
  • University Dimitrie Cantemir University - Faculty of Law Cluj-Napoca- National and European Business Law - Master, 2017 - 2018
Global Bench
Construction, Infrastructure & Real Estate Projects Bench

EPC contracts, project management, engineering, procurement, PPPs, real estate, and construction claims.

Services & Capabilities
Arbitration Dispute System Design Neutral Services
Who this Neutral Serves
For Construction Industry For Small Business For Global Corporations
Industry Experience
Professional Services Construction & Infrastructure
INDS™ Qualified

Octavian Brasai is listed on the TheNeutrals.ORG™ Global Bench and is qualified under the INDS™ Neutral Evaluation methodology. Every engagement follows the six-stage INDS™ process: Intake, Information Gathering, Behavioural Assessment, Risk Analysis, Strategy & Settlement Feasibility, and Final Report. All four sub-frameworks (INDS-BF™, INDS-RG™, INDS-SFM™, INDS-SF™) apply to every evaluation engagement.

Find other neutrals on the bench

1,329+ certified neutrals across 80+ countries.