An international institution for Independent Neutral Evaluation

HomeNeutral EvaluationINDS™

TN/INDS/00
Edition 2027 · effective 1 January 2027

The method

Structure over opinion.

INDS™ is the named method inside every evaluation the institution delivers, and a trademarked asset every certified neutral is trained in. Six stages, always in order, with four sub-frameworks and a fixed report.

§ 01Six stages

Always in order. None skipped.

01

Intake & issue definition

The NE-01 intake, documents, complexity, scope and conflict checks.

02

Neutral information gathering

Documents and communications into a verified chronology.

03

Stakeholder & behavioural assessment

Interviews and INDS-BF™.

04

Evidence & risk analysis

Exposure mapped with INDS-RG™.

05

Strategy & settlement feasibility

INDS-SFM™ and INDS-SF™.

06

Final evaluation report

The 11-section report and post-report support.

§ 02Seven principles

What the method protects.

  1. 01

    Neutrality

    No side, no stake.

  2. 02

    Structure over opinion

    The process carries the view, not the personality.

  3. 03

    Behavioural understanding

    People, not only documents.

  4. 04

    Cross-functional insight

    Legal, commercial and technical together.

  5. 05

    Evidence-based decisions

    Every finding traced to evidence.

  6. 06

    Risk awareness

    Exposure stated plainly.

  7. 07

    Strategy alignment

    Options that fit what the parties need.

§ 03Four sub-frameworks

The instruments.

Stage 3

INDS-BF™ · Behavioural Framework

Ten signals: tone, defensiveness, inconsistency, avoidance, aggression, emotional triggers, role insecurity, hidden motives, power dynamics, relationship fatigue.

Stage 4

INDS-RG™ · Risk Grid

Financial, operational, behavioural, legal and reputational risk rated low, moderate or high, with time sensitivity.

Stage 5

INDS-SFM™ · Settlement Feasibility

Ten weighted factors into one score from 1 to 10.

Stage 5

INDS-SF™ · Strategy Framework

Eight outputs: primary strategy, alternatives A and B, 24–48 hour actions, a do-not-do list, communication advice, legal-aligned notes and a timeline.

§ 04The report

Eleven sections.

  1. Executive summary
  2. Factual reconstruction
  3. Behavioural analysis
  4. Evidence review
  5. Risk analysis (INDS-RG™)
  6. Settlement feasibility (INDS-SFM™)
  7. Strategic pathway (INDS-SF™)
  8. Immediate actions (24–48 hours)
  9. Do-not-do list
  10. Legal-aligned notes
  11. Final neutral assessment

The Handbook of Neutral Practice™ uses the same eleven sections from Edition 2027. GBI™ is the method inside CPRS™.

§ 05Marks

Owned by the institution.

INDS™, INDS-BF™, INDS-RG™, INDS-SFM™, INDS-SF™, GBI™, CPRS™ and UNIONE COMMISSION™ are marks of TheNeutralsORG™. Certified neutrals may describe themselves as INDS™-trained under the brand rules. Licensing to other institutions is available through the association programme.