Keshav Varkhedkar
Arbitrator & Mediator · Mumbai, India
Date of Joining the Organization : 05th February 1991 Total service in CIDCO : 28 years 5 months Cadre: Additional Chief Engineer (ACE), Sep-10 Division: ACE(I & NT) Major Works carried out in Brief Construction of 1344 tenements for Unnati scheme of CIDCO at Ulwe. Construction of Exhibition Centre at Vashi.

Use the institutional verification route for current standing.
Read the professional through the functions actually published on the record.
Practice fields are shown from the public professional record. No additional expertise is inferred.
mediation
Published on the structured professional record. The live mandate should define the exact function, authority and scope.
arbitration
Published on the structured professional record. The live mandate should define the exact function, authority and scope.
Published context from the professional record.
These fields support discovery and comparison. They do not create a separate certification.
Verified professional foundation where it exists.
Only values present in the structured record are shown.
- BE(Civil) from Visvesvaraya National Institute of Technology, Nagpur in 1982.
What the public record currently says.
The profile uses the supplied public record as its source.
Keshav Varkhedkar in professional context.
Cadre: In-Charge CE & GM(Tech), Sep-11& Chief Engineer, Jul-12
Division: CE & GM(Tech) & CE(NM)
Major Works carried out in Brief
Construction of HIG, MIG, LIG & EWS Housing scheme at Kharghar.
Construction of EWS and LIG houses in various nodes of CIDCO under PMAY (On-going).
Construction of Bhoomiputra Bhavanat Ulwe node (Ongoing).
Construction of Water Transport Terminal at Nerul Seawoods (Ongoing).
Metro project -Successful erection of 100m span bridge over Diva-Panvel Railway line.
Award and start of works of Metro stations which were terminated earlier.
Administrative approval of Metro line nos. 2 & 3 costing 5000 crs.
Development of all types of infrastructure works in various nodes of Navi Mumbai.
Metro Rail Project Summary –During my Tenure
Two Rolling stocks were received in Metro Depot and are getting ready for trial run
100m Steel span was fabricated and successfully launched
Station contracts which were terminated, were awarded to new contractors
Civil works for Viaduct, Depot were completed
Receiving sub-stations were completed and are at the stage of power-on.
RDSO / Railway Board has approved almost all system documents
Board Resolution to Detailed Project Report for Line 2, 3 & 4
RFP for Operation & Maintenance of Navi Mumbai Metro were invited on Gross Cost Model and are in the process of award.
The Project is now in advance stage and test runs will commence shortly. The Commercial Operations are expected to commence in second half of 2020
EXTRA ACTIVITY / ACHIEVEMENTS
Use of Pre fab Technology in Kharghar and Ulwe for mass housing scheme comprising of 2500 tenements for LIG & EWS. By using this technology projects could be completed within stipulated time period and without any cost overrun.
Papers published:
Role of Project Management Consultant in Construction Industry.
Low cost Housing
Member of the Institutions:
Chairman of Institution of Engineers.
Life member of Indian Concrete Institute.
List of awards / recognitions won:
Felicitated by Hon. CM of Maharashtra on 25/01/2010 on successful completion of Vastu Vihar Housing Project at Kharghar.
Additional published discovery fields.
No field is expanded beyond what is present in the public record.
Professional fit first. Conflict clearance before confirmation.
The public profile is evidence only; appointment remains matter-specific.
Continue through adjacent public records.
Related profiles are selected from the same public record set and are not rankings.