The NeutralsORG

World Neutrals Summit 2026 — Barcelona · August 2026 · 58 spots remaining → Participate at Barcelona
TheNeutrals.ORG™
$200Clarity Snapshot™ from
11sections in every NER report
3–5days delivery
INDS™every evaluation governed
Submit NE-01 Intake →
System 02 · DRS
Dispute Resolution Systems

Seven instruments. One methodology. Arbitration is always the last resort — every instrument before it is designed to prevent it.

Explore DRS →
$800
Mediation from
56+
Convention countries
48h
Appointment
$800Mediation from
56+Singapore Convention countries
164NY Convention countries
48happointment confirmation
Appoint a Neutral →
The Neutral Profession
Get Certified. Join the Bench.

1,329+ certified neutrals. 80+ countries. 12 sector benches. Exclusive by design — maximum 10 per sector per country.

The Profession →
1,329+
Certified
80+
Countries
12
Benches
1,329+certified neutrals
80+countries represented
12sector benches
10max per sector per country
Apply — Free →

Lee has more than 30 years of civil engineering and project management experience. In recent years, he has worked on large transport infrastructure projects around Australia, including the Homebush Bay Rail Line (Sydney), Olympic Park Station (Sydney), Cross City Tunnel (Sydney), Eastlink (Melbourne), Urban Superway (Adelaide) and Airport Link (Brisbane). He is a member of Australian Institute of Company Directors,

Lee’s experiences with cooperative relationship contracting include the $512M Northern Beaches B-Line Project (TfNSW D&C), $842M South Road Superway Project (DPTI D&C) and $4.2B Airport Link Project (DTMR D&C). All three of those projects involved close collaboration with multiple stakeholders and the Client.

PROJECT EXPERIENCE

WINTERLONG PROJECT SERVICES
August 2018 – Present – Consulting

SHB New Bridge Climb infrastructure
Development of STACT Governance and Risk Management Technology system
Mediation meetings
Dispute Mitigation meetings

October 2017 – July 2018
HCMT Depot Project – Downer
Project Director
Design and Construct rail maintenance facility for Metro High Capacity Trains. This is part of a PPP project that is being led by Evolution Rail.

July 2017 – October 2017 – Seymour Whyte
Precontracts Bid Team
Lee assistedwith several promising road and bridge infrastructure bids. He will be availableand ready to lead a large and multi-faceted team under different types of contracting models, such as the one proposed for the Batemans Bay Bridge Project.

LEIGHTON CONTRACTORS

1983 – 2002
Lee started out as a site engineer with Leighton Contractors and worked through to become a Project Manager and then Construction Manager. In that time he was involved on a number of significant major infrastructure projects including the first PPP project in NSW. Some of the most notable and iconic projects are listed below.

Sydney International Aquatic Centre (and stage 2 reconfiguration post-Olympics) : Project Manager

MEMBERSHIPS
  • Accredited Mediator
  • AICD
  • Resolution Institute
  • RMIA

Background and Education +

  • Current Master Disaster, Resilience, and Sustainable Development, UON
  • 2018, Master Dispute Resolution, UTS,
  • 2014, Master Engineering Management, UTS,
  • 2005, Graduate Certificate Engineering Management, UTS
  • 1995, Diploma of Civil Engineering, Darling Downs IAE/ TAFE OTEN
  • 1981, Architectural Draughtsman Certificate, STC

Tags +

ArbitrationMediation