The NeutralsORG

World Neutrals Summit 2026 — Barcelona · August 2026 · 58 spots remaining → Participate at Barcelona
TheNeutrals.ORG™
$200Clarity Snapshot™ from
11sections in every NER report
3–5days delivery
INDS™every evaluation governed
Submit NE-01 Intake →
System 02 · DRS
Dispute Resolution Systems

Seven instruments. One methodology. Arbitration is always the last resort — every instrument before it is designed to prevent it.

Explore DRS →
$800
Mediation from
56+
Convention countries
48h
Appointment
$800Mediation from
56+Singapore Convention countries
164NY Convention countries
48happointment confirmation
Appoint a Neutral →
The Neutral Profession
Get Certified. Join the Bench.

1,329+ certified neutrals. 80+ countries. 12 sector benches. Exclusive by design — maximum 10 per sector per country.

The Profession →
1,329+
Certified
80+
Countries
12
Benches
1,329+certified neutrals
80+countries represented
12sector benches
10max per sector per country
Apply — Free →

Date of Joining the Organization : 05th February 1991
Total service in CIDCO : 28 years 5 months

Cadre: Additional Chief Engineer (ACE), Sep-10

Division: ACE(I & NT)
Major Works carried out in Brief

Construction of 1344 tenements for Unnati scheme of CIDCO at Ulwe.
Construction of Exhibition Centre at Vashi.

Cadre: In-Charge CE & GM(Tech), Sep-11& Chief Engineer, Jul-12

Division: CE & GM(Tech) & CE(NM)
Major Works carried out in Brief

Construction of HIG, MIG, LIG & EWS Housing scheme at Kharghar.
Construction of EWS and LIG houses in various nodes of CIDCO under PMAY (On-going).
Construction of Bhoomiputra Bhavanat Ulwe node (Ongoing).
Construction of Water Transport Terminal at Nerul Seawoods (Ongoing).
Metro project -Successful erection of 100m span bridge over Diva-Panvel Railway line.
Award and start of works of Metro stations which were terminated earlier.
Administrative approval of Metro line nos. 2 & 3 costing 5000 crs.
Development of all types of infrastructure works in various nodes of Navi Mumbai.

Metro Rail Project Summary –During my Tenure

Two Rolling stocks were received in Metro Depot and are getting ready for trial run
100m Steel span was fabricated and successfully launched
Station contracts which were terminated, were awarded to new contractors
Civil works for Viaduct, Depot were completed
Receiving sub-stations were completed and are at the stage of power-on.
RDSO / Railway Board has approved almost all system documents
Board Resolution to Detailed Project Report for Line 2, 3 & 4
RFP for Operation & Maintenance of Navi Mumbai Metro were invited on Gross Cost Model and are in the process of award.
The Project is now in advance stage and test runs will commence shortly. The Commercial Operations are expected to commence in second half of 2020

EXTRA ACTIVITY / ACHIEVEMENTS

Use of Pre fab Technology in Kharghar and Ulwe for mass housing scheme comprising of 2500 tenements for LIG & EWS. By using this technology projects could be completed within stipulated time period and without any cost overrun.

Papers published:

Role of Project Management Consultant in Construction Industry.
Low cost Housing

Member of the Institutions:
  • Chairman of Institution of Engineers.
  • Life member of Indian Concrete Institute.
List of awards / recognitions won:

Felicitated by Hon. CM of Maharashtra on 25/01/2010 on successful completion of Vastu Vihar Housing Project at Kharghar.

Background and Education +

  • BE(Civil) from Visvesvaraya National Institute of Technology, Nagpur in 1982.

Tags +

ArbitrationMediation